{"id":3875,"date":"2023-11-04T16:33:04","date_gmt":"2023-11-04T16:33:04","guid":{"rendered":"https:\/\/dailysylhetersomoy.com\/english\/?p=3875"},"modified":"2023-11-04T16:33:04","modified_gmt":"2023-11-04T16:33:04","slug":"pm-launches-another-metro-rail-project","status":"publish","type":"post","link":"https:\/\/dailysylhetersomoy.com\/english\/pm-launches-another-metro-rail-project\/","title":{"rendered":"PM launches another metro rail project"},"content":{"rendered":"<p>Desk News :: Prime Minister Sheikh Hasina on Saturday inaugurated a project on the construction of another Dhaka Metro Rail link (MRT Line-5) after opening the Agargaon-Motijheel section of the urban train network.<\/p>\n<p>The 20-km long northern route will extend from Vatara to Hemayetpur in Savar, passing through key areas &#8212; Gabtoli, Mirpur-10 and Gulshan.<\/p>\n<p>The PM inaugurated the construction work at a ceremony around 3:30 pm on Saturday.<\/p>\n<p>The Tk 41,239 crore project is expected to be completed by 2028.<\/p>\n<p>Following the ceremony, the Prime Minister participated in an Awami League rally at Arambagh in the city\u2019s Motijheel area.<\/p>\n<p>For the northern route of the MRT Line-5, all necessary equipment and workforce have been assembled for soil and land development at the depot at Hemayetpur in Savar.<\/p>\n<p>Aftab Hossain Khan, director of the project, said that the development work for the 99.25-acre depot area, a joint venture involving Japan&#8217;s TAO Corporation and Bangladesh&#8217;s Spectra Engineers Ltd, will now begin.<\/p>\n<p>The project was approved in 2019. It consists of a 13.5 km underground section and a 6.5 km elevated section. It will encompass a total of 14 stations, with nine of them located underground. Around 10 lakh people could be able to travel by the MRT-5 every day.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Desk News :: Prime Minister Sheikh Hasina on Saturday inaugurated a project on the construction of another Dhaka Metro Rail link (MRT Line-5) after opening the Agargaon-Motijheel section of the urban train network. The 20-km long northern route will extend from Vatara to Hemayetpur in Savar, passing through key areas &#8212; Gabtoli, Mirpur-10 and Gulshan. The PM inaugurated the construction work at a ceremony around 3:30 pm on Saturday. The Tk 41,239 crore project is expected to be completed by 2028. Following the ceremony, the Prime Minister participated in an<\/p>\n","protected":false},"author":1,"featured_media":3876,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[],"class_list":["post-3875","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bangladesh"],"_links":{"self":[{"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/posts\/3875"}],"collection":[{"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/comments?post=3875"}],"version-history":[{"count":1,"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/posts\/3875\/revisions"}],"predecessor-version":[{"id":3877,"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/posts\/3875\/revisions\/3877"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/media\/3876"}],"wp:attachment":[{"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/media?parent=3875"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/categories?post=3875"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dailysylhetersomoy.com\/english\/wp-json\/wp\/v2\/tags?post=3875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}